| AI power is constrained more by availability than by electricity price. | Supported | The IEA identifies grid connections, permitting, transformers, cables and generation equipment as near-term constraints; around 20% of planned capacity could face delays. | Time-to-power and contracted delivery can matter more than broad commodity direction. |
| Interconnection times have lengthened materially. | Supported | LBNL reports a median of more than five years from request to commercial operation for the subset of US projects completed in 2025. | Grid equipment, engineering capacity and existing connection rights deserve separate underwriting. |
| Behind-the-meter generation will bridge the gap. | Qualified | IEA sees a growing onsite-gas pipeline, but many projects remain early-stage and must manage rapid load swings, fuel delivery, emissions, permits and reliability. | Do not equate an announced onsite project with available, contracted power. |
| Solar plus batteries can become a dominant supply route. | Qualified | Renewables are expected to meet nearly half of global data-centre demand growth to 2030, but firm 24/7 service still needs grid capacity, storage duration or dispatchable backup. | Separate low-cost energy from round-the-clock capacity and from connection timing. |
| Sodium-ion batteries could cut storage cost tenfold. | Speculative | Sodium-ion may reduce mineral dependence and serve some stationary uses, but a tenfold system-cost reduction is not a bankable base-case assumption today. | Treat chemistry breakthroughs as upside optionality; underwrite factories, yield, cycle life and delivered system cost. |
| SMRs or fusion will solve near-term AI power needs. | Long-dated | IEA expects first SMRs around or just after 2030; fusion and space-based compute remain outside a practical 2026–30 base case. | Near-term exposure is primarily development and policy optionality, not operating cash flow. |